A diagram of the process of stone coating.
A table with several different colors and their respective names.

How to Apply

  • Step 1
    Clean substrate by eliminating dirt, oil, loose or friable matter and moisture. Mask area around the substrate with plastic or paper to prevent overspray.
  • Step 2:
    Prime with brush, roller or HVLP equipment (Color Coat base Primer) and let dry to touch.
  • Step 3:
    Apply Spec Stone Décor in a vertical/horizontal manner. Let dry for 30 minutes to an hour.
  • Step 4:
    Apply two coats of Spec Stone protective clear , high- gloss or semi-gloss.